Red Bud to Pinckneyville


Conduct Phase I engineering studies, environmental studies, and public involvement to expand IL 154 lanes to 4 lanes from the east city limits of Red Bud to the West City limits of Pinckneyville for approximately 37 miles. The focus study area will include a range of alternatives thru and around Sparta and an improved crossing of the Kaskaskia River.

Funding Request: Phase I Engineering and Environmental Study to expand IL 154 to 4 lanes from Red Bud to Pinckneyville, $15 million

Red Bud to Pinckneyville.jpg

IDOT Crash Data Report Map

SWIL Conn 8.5X11 Crash Data Map.jpg

DISCLAIMER: The motor vehicle crash data referenced herein was provided by the Illinois Department of Transportation. Any conclusions drawn from analysis of the aforementioned data are the sole responsibility of the data recipient(s).  Additionally, for coding years 2015 to present, the Bureau of Data Collection uses the exact latitude/longitude supplied by the investigating law enforcement agency to locate crashes. Therefore, location data may vary in previous years since data prior to 2015 was physically located by bureau personnel.

IDOT 5-Year Functional Classification Maps

smFC County_Randolph.jpg

Randolph County - 2019

smFC County_PERRY.jpg

Perry County - 2019